翻訳と辞書 |
Nevada Solar One : ウィキペディア英語版 | Nevada Solar One
Nevada Solar One is a concentrated solar power plant, with a nominal capacity of 64 MW and maximum steam turbine power output up to 72 MW net (75 MW gross), spread over an area of . The projected CO2 emissions avoided is equivalent to taking approximately 20,000 cars off the road annually. The project required an investment of $266 million USD,〔(Solar Steam at Nevada Solar One )〕 and the project officially went to operation in June 2007.〔(ACCIONA’s Nevada Solar One )〕 Electricity production is estimated to be 134 million kilowatt hours per year.〔Technology News Daily. (Nevada Solar One ).〕 It is the second solar thermal energy (STE) power plant built in the United States in more than 16 years,〔(Utility-Scale Solar Plant Goes Online in Nevada )〕 and the largest STE plant built in the world since 1991.〔(Arizona Utility to Buy Power from a 280-Megawatt Solar Power Plant - EnergyVortex )〕 It is located in Eldorado Valley in the southwest fringe of Boulder City, Nevada, and was built in that city's Energy Resource Zone, which requires renewable generation as part of plant development permits; Nevada Solar One was approved as part of Duke Energy's larger El Dorado Energy project that built 1 GW of electrical generation capacity. The solar trough generation was built by Acciona Solar Power, a partially owned subsidiary of Spanish conglomerate Acciona Energy.〔(【引用サイトリンク】 title= Acciona Energía website )〕 Lauren Engineers & Constructors (Abilene, TX) was the EPC contractor for the project. Acciona purchased a 55 percent stake in Solargenix (formerly Duke Solar) and Acciona owns 95 percent of the project. Nevada Solar One is unrelated to the Solar One power plant in California. ==History==
In 2006, located 30 miles north of Tucson, Arizona Public Service's Saguaro Solar Facility opened, with 1 MW of electrical generation capacity.〔(Raising Arizona’s renewable power )〕 Nevada Solar One went online for commercial use on June 27, 2007. It uses similar technology and was constructed over a period of 16 months. The total project site is approximately 400 acres (0.6 mi² / 1.6 km²), while the solar collectors cover .
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Nevada Solar One」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|